Fortec
Fortec Stabilization Systems
Carbon Fiber Technologies
Questions? Call Us
1-800-207-6204

Versión de Español
Case Studies

Date: April 2005
Structure: Clay Brick, First Presbyterian Church of Coldwater, MI
Contractor: Bomer Restoration, Inc.
Engineer: Ledy Design Group
Material Used: Fortec unidirectional 900 gsm carbon plate with peel-ply surface. Fortec 4020 Resin.


Project Scope:
The Bell Tower's upper platform, made of 4" clay-brick units, was under-designed for code wind loads.



Solution:
Fortec Carbon Plates was chosen in conjunction with steel anchoring for wood structure.

Observations:
Carbon plates tied masonry bell tower together and increased wind shear capacity beyond code requirements. Steel would have been difficult to handle in the very tight quarters.






HOME | ENGINEERING TIPS & DESIGN | PRODUCTS & SPECIFICATIONS | PROJECTS & CASE STUDIES | ABOUT Fortec | CONTACT FORTEC


Fatal error: Call to undefined function mysql_connect() in /home/fortecst/public_html/counter/mysql.class.php on line 23