Fortec
Fortec Stabilization Systems
Carbon Fiber Technologies
Questions? Call Us
1-800-207-6204

Versión de Español
Case Studies

Date:November 18, 2006
Location: Staunton, Virginia. Interstate 81 Southbound at Route 994 Overpass
Contractor: Lanford Brothers
Engineer: Virginia Department of Transportation, Chuck Snyder and Jungi Meng PHD, PE
Material Used: Fortec Stabilization 300 gsm unidirectional Carbon Fiber Fabric with 4550 Epoxy Resin
Project Scope:
Concrete column has been struck by traffic several times creating shear stress cracking in column. Cracks were wrapped in 0o and 90o directions.

Bridge Column Repair


Conclusion:
The use of Fortec Carbon Fabric restored compression and shear capability of column that was damaged. Column repair was completed in 6 hours.





HOME | ENGINEERING TIPS & DESIGN | PRODUCTS & SPECIFICATIONS | PROJECTS & CASE STUDIES | ABOUT Fortec | CONTACT FORTEC


Fatal error: Call to undefined function mysql_connect() in /home/fortecst/public_html/counter/mysql.class.php on line 23