Fortec
Fortec Stabilization Systems
Carbon Fiber Technologies
Questions? Call Us
1-800-207-6204

Versión de Español
Case Studies

Date: May 12, 2002
Structure: Sewer Man-hole, Sandusky, Ohio
Contractor: Lee Infrastructure Restoration
Engineer: Sandusky Water Works
Material Used: Fortec Carbon/Kevlar Grid

Project Scope:
Water infiltration, where brick tops jopin poured concrete, due to freeze/thaw and vibration. Standard repair materials failed over time.

Sewer Repair Sewer Repair Sewer Repair


Solution:
Fortec carbon was designed to make three monolithic to resist separation movement, thereby increasing life of the polyurethane grout and cematitious coatings.

Observations:
Sewer installs performed as designed, increasing the traditional water stop life.




HOME | ENGINEERING TIPS & DESIGN | PRODUCTS & SPECIFICATIONS | PROJECTS & CASE STUDIES | ABOUT Fortec | CONTACT FORTEC


Fatal error: Call to undefined function mysql_connect() in /home/fortecst/public_html/counter/mysql.class.php on line 23