Location: Illinois
Company: The Structural Shop
Engineer: Eric Means, S.E., P.E.
Material: Fortress Staples
Project Scope: Repair: Field Testing of Fortress Staple

  • 7 ft high poured foundation wall with a vertical crack roughly 1/8" wide.
  • Tension angles were used to close wall crack to roughly 3/18".
  • The crack was then stapled with Fortress carbon staples.
  • When the tension angles were removed the wall and crack remained at closed position.