Fortec
Fortec Stabilization Systems
Tecnologías de Fibra de Carbon
Preguntas? Llámennos
1-800-207-6204

English Version
Case Studies

Date: April 4, 2004
Structure: Brick Masonry, Legal Aid Society of Cleveland
Contractor: Geotech Services, Inc.
Engineer: Shaw & Associates
Material Used: Fortec Carbon/Kevlar grid straps.

Project Scope:
Renovations to current building would add significant loading to existing unreinforced masonry units and compromise shear capability.



Solution:
Fortec Grid Straps were laminated to both sides of C.M.U. wall to increase shear capacity.

Observations:
The use of Fortec Carbon Kevlar Grid straps allowed for a very fast procedure that achieved scope and allowed for original design room space.






PÁGINA INICIA | PRODUCTOS Y ESPECIFICACIONES | PROYECTOS Y ESTUDIOS DE CASOS | SOBRE FORTEC | CONTÁCTE FORTEC


Fatal error: Call to undefined function mysql_connect() in /home/fortecst/public_html/counter/mysql.class.php on line 23